With 60,000 square meters spread across 18 floors, Platinan is one of Gothenburg’s largest construction projects. The building houses offices, restaurants, shops, and hotels. For the project, an individually adapted solution was developed to meet the complex needs of the property.
In all the 450 hotel rooms, we have installed a specially adapted solution with the two-zone controller Regio Ardo, which has been an effective solution both economically and functionally. In the office part, we wanted to avoid installing control equipment at the tenants and therefore chose to place the functionality centrally and communicate via Modbus to the room units. The indoor climate will thus be easy to control locally, while the functionality is installed centrally, says Jan Gustafsson, project manager at Keylogic.
The project was implemented in 2020 and since April there is full activity in the building. At present, work continues with fine-tuning the system to achieve maximum comfort.
In such an extensive building, all tenants have different needs. Now that the property has been in operation for several months, we are beginning to formulate some conclusions about how the complex and unique building is functioning. The focus going forward is to continue working with tenant adaptations and create an indoor climate dimensioned for each individual tenant, with consideration taken to ventilation, temperature, outdoor climate, and time of day, Jan concludes.